Work included
Electrical-equipment manufacturing and engineering facility
- Three smoke-control zones
- One 5-hp and two 2-hp exhaust fan assemblies
- Three 2-hp intake fan assemblies
- Ducting, grilles and controls
- Installation, engineering and as-built drawings
- Testing and commissioning
Project context
Smoke-control work is more than supplying fans. The recorded scope combined exhaust, intake, air distribution and control elements across three zones, with the engineering and verification work retained in the same project record.
Completed work
The scope identifies one 5-hp and two 2-hp exhaust fan assemblies, three 2-hp intake fan assemblies, related ducting, grilles and controls. It also records installation, engineering, as-built drawings, testing and commissioning instead of treating those steps as assumed extras.
Why it matters
A smoke-control quotation should define the zones, airflow equipment, ductwork, controls, site installation, drawings and functional testing together.
What to send for a similar requirement
Send the details that apply to your project:
- Facility type, exact location and site contact
- Equipment agent, capacity, format, quantity and current condition
- New supply, refill, reconditioning, conversion, lease or system-work requirement
- Available labels, photographs, schedules, plans and service records
- Access rules, collection or work window and target date
DGRB will use these details to define the quotation, collection plan, site work and required records.