Completed work

Three-zone smoke control — Rizal

The record documents a coordinated mechanical smoke-control scope for an electrical-equipment manufacturing and engineering facility.

Document month
April 2026
Broad location
Antipolo City, Rizal
Facility type
Electrical-equipment manufacturing and engineering facility
Equipment / scope
Mechanical smoke-control system

Work included

Electrical-equipment manufacturing and engineering facility

  1. Three smoke-control zones
  2. One 5-hp and two 2-hp exhaust fan assemblies
  3. Three 2-hp intake fan assemblies
  4. Ducting, grilles and controls
  5. Installation, engineering and as-built drawings
  6. Testing and commissioning

Project context

Smoke-control work is more than supplying fans. The recorded scope combined exhaust, intake, air distribution and control elements across three zones, with the engineering and verification work retained in the same project record.

Completed work

The scope identifies one 5-hp and two 2-hp exhaust fan assemblies, three 2-hp intake fan assemblies, related ducting, grilles and controls. It also records installation, engineering, as-built drawings, testing and commissioning instead of treating those steps as assumed extras.

Why it matters

A smoke-control quotation should define the zones, airflow equipment, ductwork, controls, site installation, drawings and functional testing together.

What to send for a similar requirement

Send the details that apply to your project:

  • Facility type, exact location and site contact
  • Equipment agent, capacity, format, quantity and current condition
  • New supply, refill, reconditioning, conversion, lease or system-work requirement
  • Available labels, photographs, schedules, plans and service records
  • Access rules, collection or work window and target date

DGRB will use these details to define the quotation, collection plan, site work and required records.