Need a smoke control system? Start with the building strategy.

Smoke control is an engineered building system, not a standalone fan. We assess the smoke zones, escape routes, pressure targets, exhaust and makeup air, controls, power and required operating sequence before defining the scope.

Call DGRB
  • Design criteria firstZones, pressure and airflow defined
  • Building systems coordinatedFans, dampers, doors, FDAS and power
  • Tested as a sequenceInputs and outputs verified together

Fire protection
for commercial sites.
Fire protection
for commercial sites.

DGRB supplies equipment, installs systems and provides service records from delivery through inspection.

See what DGRB handles

Selected organizations DGRB has worked with

Novo Nordisk
UnionBank
Miyasaka Polymer
Green GSM
Höegh Evi Services AS
Skymart
ASTI Business Services Inc.
Victory (CVF)
10+ years Industry expertise
Regional + national Project coverage
Project-based Supply, installation or service
BFP support Documentation and inspection coordination
Design basis Confirmed for each project
Defined handover Records included by scope
Commercial sites Equipment and system work

Smoke control system types

A building may need one of these systems or a coordinated combination. The right arrangement depends on the smoke zone, escape routes and approved fire-safety strategy.

Smoke extraction system

Removes smoke from defined zones through coordinated exhaust points, fans, ducts, dampers, discharge routes and replacement air.

Makeup air system

Introduces replacement air to support smoke exhaust without creating uncontrolled negative pressure or pushing smoke toward escape routes.

From
assessment
to
handover.

Smoke control starts with the design objective and the actual building. We define the required sequence first, then coordinate the equipment, controls, testing and records around it.

01

Site assessment

We review the building, smoke zones, escape routes, current systems, available plans and design requirements.

02

Design & planning

We coordinate pressure, airflow, exhaust, makeup air, fans, dampers, controls, power and system interfaces.

03

Review quotation

We discuss the proposed scope, inclusions, commercial terms and questions before approval.

04

Supply & installation

Fans, dampers, ducts, controls, wiring and interfaces follow the agreed project scope.

05

Testing & commissioning

The installed system is tested and commissioned against the approved project scope and operating sequence.

06

Service + BFP follow-up

We remain available for maintenance, project records and BFP-related follow-up within our scope.

Smoke control installed?
Keep the sequence ready.

We inspect and test smoke control systems against their documented operating sequence and design criteria, including the connected fans, dampers, controls, doors, power and interfaces within our scope.

  1. 01

    Review fans, dampers, controls, panels, status signals, doors, ductwork and visible system condition.

  2. 02

    Run each agreed smoke-control mode and confirm the initiating inputs and commanded outputs.

  3. 03

    Measure the required pressure differences, airflow or exhaust performance and check door operation where applicable.

  4. 04

    Issue test records, identify deficiencies and coordinate corrective work or BFP-related follow-up within our scope.

FAQ

Smoke control,
made clear.

Straight answers about pressurization, smoke exhaust, HVAC coordination, testing, maintenance and project information.

It is an engineered system used to limit, direct or remove smoke during a fire. Depending on the building strategy, it can use pressure differences, mechanical exhaust, makeup air, natural ventilation or a coordinated combination.

Completed work

Related DGRB projects

Selected DGRB projects involving this equipment or system category.

April 2026Antipolo City, Rizal

Electrical-equipment manufacturing and engineering facility

Three-zone smoke-control installation with exhaust and intake fan assemblies, ducting, grilles, controls, engineering, as-builts, testing and commissioning.

Scope: Mechanical smoke-control system

View the project
See all completed work
Request a Site Assessment

Tell us about your
smoke control project.

Send the site location, whether the project is new or existing, and any plans or system details available. We’ll review the information and contact you about the next step.

Call DGRB

Tell us about your smoke control project.
We’ll review the details and contact you.

Need to speak with us first? Call, SMS or Viber 0917 316 4253, or email inquiry@dgrbfiresafety.com.

Contact details

Project setup Select one or both

We use these details only to assess and respond to your enquiry. See our Privacy Notice.

Reviewed by DGRB Fire Safety Technical Team · Updated August 9, 2026 · References: BFP Revised IRR of RA 9514 and NFPA 92 — Smoke Control Systems.