Industries

Different facilities create different fire-protection decisions.

Use the facility type to narrow the likely equipment, detection, suppression and maintenance requirements before the final design is confirmed.

Represented sectors
4 main groups
Facility profiles
13 specific types
Assessment basis
Hazard & occupancy

Match the protection approach to the site.

Occupancy, stored materials, ceiling height, equipment, operating conditions and approved plans shape the final scope.

Industrial and logistics

Commercial and mixed-use

Residential and hospitality

Institutional and critical

Send the site details

Include the facility use, location, current protection, available plans and known authority comments.

Documented experience

Completed work across facility types

Selected DGRB work records organized by facility type.

Completed work across facility types
Date / LocationFacility & WorkScopeAction
June 2026Dasmariñas, CaviteOffice, ICT and general-merchandise supplier

Refill and reconditioning of 75 10-lb dry-chemical fire extinguishers.

Dry-chemical fire extinguishersCase
May 2026Las Piñas, Metro ManilaHerbal-supplement and food manufacturing facility

Refill of 20 dry-chemical, 20 HCFC-123 and three 50-lb AFFF units, for 43 documented extinguishers across three agents.

Dry-chemical, HCFC-123 and AFFF fire extinguishersCase
April 2026Antipolo City, RizalElectrical-equipment manufacturing and engineering facility

Three-zone smoke-control installation with exhaust and intake fan assemblies, ducting, grilles, controls, engineering, as-builts, testing and commissioning.

Mechanical smoke-control systemCase
See all completed work

Discuss your facility

Send the available documents and site details for review.

Discuss your facility

Reviewed by DGRB Fire Safety Technical TeamUpdated August 9, 2026