Decisions shaped by this facility
Start with the occupancy, hazards, layout, installed condition and available project information.
Operational constraints to identify early
- Schedule testing and noisy or disruptive work around tenants and business hours.
- Track fit-out changes that move partitions, ceilings, devices or sprinkler heads.
- Keep panels, valves, risers and test points accessible to the team responsible for maintenance.
Starting points for new and existing work
New construction, expansion or fit-out
For a new office or fit-out, DGRB can review the floor arrangement and building interfaces before defining the equipment, system and testing scope.
Existing-system maintenance, upgrade or rectification
For an occupied building, the assessment should identify alterations, faults, inaccessible components and the maintenance or rectification work required without assuming the original plans still match the site.
What to send for the assessment
- Floor plans, tenant layout and building height
- Existing FDAS, sprinkler, standpipe and smoke-control information
- Fit-out or renovation drawings
- Known device, panel, valve or egress concerns
- Building access rules and preferred work windows
Relevant systems and equipment
Review the systems and equipment commonly discussed for this facility type.
Use the site conditions, approved plans and current fire-safety rules. BFP Revised IRR of RA 9514
Completed work for office buildings
Selected DGRB records from office buildings projects.
| Date / Location | Facility & Work | Scope | Action |
|---|---|---|---|
| June 2026Dasmariñas, Cavite | Office, ICT and general-merchandise supplier Refill and reconditioning of 75 10-lb dry-chemical fire extinguishers. | Dry-chemical fire extinguishers | Case |
| February 2026Metro Manila | Shared-services corporate facility Supply of 48 new 10-lb HFC-236fa units, conversion of 54 HCFC-123 units to HFC-236fa and supply of four complete fire suits. | HFC-236fa extinguishers, conversions and fire-safety PPE | Case |
| November 2025Laguna | Dairy-production office building Complete sprinkler network with pumps, 78 sprinkler heads, controls, drains, fire department connection and two existing fire-hose cabinets tied into the system. | Automatic fire sprinkler system and fire-hose cabinets | Case |
Frequently asked questions
Should an office fit-out review existing fire protection?
Yes. New partitions, ceilings and room uses can affect detection, sprinkler coverage, notification and egress equipment.
Can maintenance be scheduled outside office hours?
Share the building rules and preferred work windows so DGRB can confirm what is practical for the requested scope.
What records help with an assessment?
Current floor plans, panel and device information, maintenance records, fit-out drawings and known faults are useful starting points.