Smoke control guide

Smoke extraction project checklist

Organize the building strategy and coordinated system information needed before smoke extraction can be assessed.

Resource type
Smoke control guide
Category
Smoke control
Standard basis
NFPA 92

01 What to verify first

  1. The smoke zones and design strategy shown in approved documents
  2. The fans, ducts, dampers, shafts and discharge paths included in scope
  3. Every alarm, power, shutdown and status-monitoring interface

02 Information to prepare

  1. Mechanical, architectural, electrical and fire-alarm plans
  2. Equipment schedules, control narratives and available test records
  3. Site changes, obstructions, access constraints and known operating issues

03 Decision factors

  1. The approved operating sequence
  2. Coordination of extraction, makeup air, boundaries and door positions
  3. Safe testing, measurement, restoration and documentation requirements

04 Common mistakes to avoid

  1. Treating fan capacity as the whole smoke-control strategy
  2. Ignoring replacement air and building leakage paths
  3. Testing individual components without the approved sequence

Related equipment, systems and services

Questions buyers often ask

What does this smoke extraction system checklist cover?

It organizes the site, system and project information needed for review. Use the approved plans, current rules and product documentation for the final scope.

Can I send incomplete information?

Yes. Send what is available and clearly mark what is unknown. DGRB can identify which missing details need a site assessment or specialist confirmation.

Does completing the checklist confirm compliance?

It prepares the site and project information for review. Approval and calculations follow the applicable project process.

Documented experience

Related completed work

Selected DGRB work records related to this topic.

Related completed work
Date / LocationFacility & WorkScopeAction
April 2026Antipolo City, RizalElectrical-equipment manufacturing and engineering facility

Three-zone smoke-control installation with exhaust and intake fan assemblies, ducting, grilles, controls, engineering, as-builts, testing and commissioning.

Mechanical smoke-control systemCase
See all completed work
References

Use the approved plans, product instructions and current requirements for final decisions. BFP Revised IRR of RA 9514 · NFPA 92: Smoke Control Systems

Reviewed by DGRB Fire Safety Technical TeamUpdated August 9, 2026