01 What to verify first
- The exact building area and scope under review
- Whether the requirement is new work, alteration, repair or assessment
- Which current approved plans and system records are available
02 Information to prepare
- Floor plans, reflected ceiling information and room-use details
- Available water-supply, pump, tank and riser records without estimating missing values
- Photos and labels for existing valves, alarms, drains and affected pipework
03 Decision factors
- Occupancy, storage and room-use information shown in the project documents
- Existing-system condition and how the proposed work connects to it
- Access, shutdown constraints, phasing and required project documentation
04 Common mistakes to avoid
- Assuming visible pipe size proves system capacity
- Sending plans without identifying the exact work area
- Treating a product list as a complete system design
Related equipment, systems and services
Questions buyers often ask
What does this wet pipe sprinkler system checklist cover?
It organizes the site, system and project information needed for review. Use the approved plans, current rules and product documentation for the final scope.
Can I send incomplete information?
Yes. Send what is available and clearly mark what is unknown. DGRB can identify which missing details need a site assessment or specialist confirmation.
Does completing the checklist confirm compliance?
It prepares the site and project information for review. Approval and calculations follow the applicable project process.
Use the approved plans, product instructions and current requirements for final decisions. BFP Revised IRR of RA 9514 · NFPA 13: Installation of Sprinkler Systems