Smoke control guide

Smoke-control makeup air project checklist

Capture the replacement-air path and system interfaces needed before makeup air can be reviewed as part of a smoke-control strategy.

Resource type
Smoke control guide
Category
Smoke control
Standard basis
NFPA 92

01 What to verify first

  1. The extraction demand and smoke zones identified in approved documents
  2. The intended makeup-air sources, paths and controlled openings
  3. All fan, damper, alarm, power and status interfaces

02 Information to prepare

  1. Mechanical, architectural, electrical and control drawings
  2. Opening, fan, damper and equipment schedules
  3. Known building changes, blocked paths and prior test information

03 Decision factors

  1. Coordination with extraction and smoke-zone boundaries
  2. Effects on doors, circulation paths and normal building operation
  3. Access for testing, balancing, controls verification and maintenance

04 Common mistakes to avoid

  1. Treating makeup air as a standalone comfort-ventilation item
  2. Assuming any available opening provides the required path
  3. Changing openings or controls without reviewing the full sequence

Related equipment, systems and services

Questions buyers often ask

What does this smoke-control makeup air system checklist cover?

It organizes the site, system and project information needed for review. Use the approved plans, current rules and product documentation for the final scope.

Can I send incomplete information?

Yes. Send what is available and clearly mark what is unknown. DGRB can identify which missing details need a site assessment or specialist confirmation.

Does completing the checklist confirm compliance?

It prepares the site and project information for review. Approval and calculations follow the applicable project process.

References

Use the approved plans, product instructions and current requirements for final decisions. BFP Revised IRR of RA 9514 · NFPA 92: Smoke Control Systems

Reviewed by DGRB Fire Safety Technical TeamUpdated August 9, 2026