Completed work

Fire alarm maintenance and panel replacement in Parañaque

A maintenance visit covered 23 detectors and six manual stations. A separate repair replaced the four-zone conventional fire alarm panel.

Document month
October 2026
Broad location
Parañaque City, Metro Manila
Facility type
Commercial facility
Equipment / scope
Conventional fire detection and alarm system

Work included

Commercial facility

  1. Maintenance scope for 23 detectors and six manual call points
  2. Four-zone conventional replacement panel
  3. Two 12 V, 7.5 Ah backup batteries

Project context

The facility had an existing conventional alarm system. The maintenance scope identified the field devices by type and count. This gave the facility team a way to agree which devices belonged in the visit and to see what a separate panel repair would cover.

Completed work

The maintenance scope listed 23 detectors and six manual stations, along with wiring and zone checks, functional testing and reporting. The facility also approved a separate panel replacement. That scope included a four-zone conventional fire alarm panel and two 12 V, 7.5 Ah backup batteries. DGRB completed the maintenance and panel work in October.

Why it matters

For a comparable maintenance quotation, send the panel make and model, zone count, and device counts by floor. List any current trouble indications separately. If the panel needs replacement, ask for a separate line for the panel, batteries and associated work so your facility can approve the repair independently.

What to send for a similar requirement

Send the details that apply to your project:

  • Facility type, exact location and site contact
  • Equipment agent, capacity, format, quantity and current condition
  • New supply, refill, reconditioning, conversion, lease or system-work requirement
  • Available labels, photographs, schedules, plans and service records
  • Access rules, collection or work window and target date

DGRB will use these details to define the quotation, collection plan, site work and required records.

Related pages

Related projects