01 Check the full route to an exit
Exit and egress PMS can cover designated exit paths, corridors, stairs and doors within the agreed facility scope. Start with the floor plans or evacuation plans. Confirm the areas to walk and record so the report can identify the location of each deficiency.
Typical findings include obstructed paths, damaged or hard-to-see signs, and emergency lights with weak batteries or failed lamps. Identify doors, hardware or access controls that need a separate functional check before the visit.
02 Plan emergency lighting and exit sign checks
Give DGRB the number and type of fixtures where known, including self-contained battery units and fixtures supplied by a central emergency power source. The test scope can specify which units to check, what operation to verify and how results should be recorded.
If the job calls for a battery-duration test or a check during simulated loss of normal power, include that requirement in the request. Confirm the required duration, site access and operating window before scheduling.
03 Request a report organized by floor or area
Share the facility location, floor count, available fixture inventory and any prior findings. Ask for the report to identify checked units or areas, results, defects and any locations that need further access or testing.
- Floor plans, exit routes and emergency lighting or signage schedules
- Known failed fixtures, damaged signs or recurring battery issues
- Occupied areas, work hours and power interruption restrictions
- Required report format and any replacement or retest request
Related pages
Common questions
Can egress PMS include exit doors and stairs?
Identify the doors, stairs and other exit-route areas in the request. DGRB can confirm the walk-through and any separate hardware or functional checks in the quotation.
Can failed emergency lights be replaced during the visit?
List known failures and send photos or model details when available. Include replacement and retesting in the request so units, parts and installation can be quoted with the visit.
Can the report support my FSIC renewal preparation?
You can use the findings to organize your records and follow-up work. Check the local BFP requirements for the report, tests and other records it needs for your facility.
Use the approved plans, product instructions and current fire-safety rules. BFP Revised IRR of RA 9514