FDAS and detection guide

Conventional FDAS project checklist

Organize the project inputs needed to review a conventional fire detection and alarm system without treating a device count as a complete design.

Resource type
FDAS and detection guide
Category
FDAS and detection
Standard basis
NFPA 72

01 What to verify first

  1. The areas, floors and zones included in the requirement
  2. Whether the work is a new system, extension, replacement or fault assessment
  3. The current panel, zone and device records available for existing systems

02 Information to prepare

  1. Floor plans, device schedules and existing zone charts
  2. Panel, power-supply, detector, manual-station and notification-device labels
  3. Known cabling routes, affected interfaces and access limitations

03 Decision factors

  1. Clarity and usability of zoning for the actual facility
  2. Compatibility and supportability of existing equipment
  3. Testing, documentation, handover and future service needs

04 Common mistakes to avoid

  1. Counting devices without defining zones or interfaces
  2. Assuming visually similar detectors are compatible
  3. Leaving existing faults or undocumented alterations out of the brief

Related equipment, systems and services

Questions buyers often ask

What does this conventional FDAS checklist cover?

It organizes the site, system and project information needed for review. Use the approved plans, current rules and product documentation for the final scope.

Can I send incomplete information?

Yes. Send what is available and clearly mark what is unknown. DGRB can identify which missing details need a site assessment or specialist confirmation.

Does completing the checklist confirm compliance?

It prepares the site and project information for review. Approval and calculations follow the applicable project process.

Documented experience

Related completed work

Selected DGRB work records related to this topic.

Related completed work
Date / LocationFacility & WorkScopeAction
November 2025LagunaDairy-production office building

Conventional FDAS scope with a 10-zone panel, 27 smoke detectors, manual stations, strobe horns, conduit, wiring, testing, drawings and sprinkler monitoring.

Conventional fire detection and alarm systemCase
See all completed work
References

Use the approved plans, product instructions and current requirements for final decisions. BFP Revised IRR of RA 9514 · NFPA 72: National Fire Alarm and Signaling Code

Reviewed by DGRB Fire Safety Technical TeamUpdated August 9, 2026